Circulating water vacuum pump maintenance

Circulating water vacuum pump maintenance 1. Normal working bearing than the ambient temperature is high 15 ℃ -20 ℃, maximum not allowed to exceed 55 ℃ -60 ℃ :, the normal working bearing should be loaded 3-4 times a year. Clean the bearings at least once a year and replace the lubricant holders.
2. Frequently check? Counseling? In the case of packing seals, the packing should be compacted regularly. If the packing can not guarantee the required sealing performance due to wear, new packing should be replaced. British Prime packing vacuum pump can not be pressed too tight. Normally packed packing, allowing water to drip out, to ensure cooling and to enhance tightness.
4. If the parking time is more than one day, the water in the pump and water separator must be released to prevent corrosion.
5. If the mechanical seal, the phenomenon of leakage, mechanical seals should check the dynamic and static ring is damaged, or the seal has been aging, in case of the above, are required to replace the new parts.

Solar Power

Our firm introduced whole set of good-sized numerical control hydraulic folding equipment(1280/16000) as well as equipped with a series of good-sized professional equipments of armor plate-flatted machine, lengthways cut machine, numerical control cut machine, auto-closed up machine, auto-arc-weld machine, hydraulic redressing straight machine, etc. The firm produces all sorts of conical, pyramidal, cylindrical steel poles with production range of dia 50mm-2250mm, thickness 1mm-25mm, once taking shape 16000mm long, and large-scale steel components. The firm also is equipped with a multicolor-spayed pipelining. At the meantime, for better service to the clients, our firm founded a branch com. The Yixing Jinlei Lighting Installation Com, which offers clients a succession of service from design to manufacture and fixing.

Street Lighting Pole, Solar Power, Solar Lighting Pole

Jiangsu Xinjinlei Steel Industry Co., Ltd. , https://www.steel-pole.com