Jiang Daming: Strengthening the control of the use of contaminated land

On November 4th, the 24th meeting of the Standing Committee of the 12th National People's Congress held in Beijing held a joint meeting to conduct a special inquiry on the report of the Law Enforcement Inspection Group of the Standing Committee of the National People's Congress on the inspection of the implementation of the Environmental Protection Law of the People's Republic of China. The responsible person of the relevant department of the State Council shall be consulted at the meeting.

Jiang Daming, Minister of Land and Resources, responded to questions about the impact of soil pollution on China's food security. The Ministry of Land and Resources will work with relevant departments to actively cooperate with the National People's Congress in the legislative work on pollution control and use control, and strengthen relevant technical standards. System.

Jiang Daming said that in conjunction with departmental functions, the Ministry of Land and Resources is currently carrying out the following work:

Seek truth from facts and carry out land type changes according to law on heavily polluted cultivated land;

When scientifically delineating permanent basic farmland, the heavily polluted cultivated land shall be drawn out of the established basic farmland;

Strengthen the control of the use of contaminated land, speed up the establishment of linkage mechanism for the identification, restoration and management of contaminated sites, management of planned use, and access control of land use, gradually establish a list of contaminated land, determine the negative list of development and utilization, and prevent unremediation Improper use of contaminated sites;

Do a good job in source management and resolutely curb the creation of new soil pollution;

We will rely on scientific and technological innovation to prevent and control land pollution. In accordance with the “three deep and one soil” development strategy in the “13th Five-Year” scientific and technological innovation plan of the land and resources system, we will strengthen the construction of land disciplines, especially the use of technological innovation to promote the management of polluted land.

Automotive Interior Plastic Injection Mould includes automotive dashboard Plastic Injection Mould, automotive interior console plastic injection mould, automotive A, B, C pillar mould, automotive air conditioner plastic mould, automotive seat plastic injection mould and all other interior plastic accessories mould.


Automotive Interior Plastic Injection Mould Automotive Interior Plastic Injection Mould

Automotive Interior Plastic Injection Mould Automotive Interior Plastic Injection Mould



FAQ:


Q1: What tolerances can you achieve for Automotive Interior Plastic Injection Mould?


There is not a given set of tolerances that fits all processes and materials. In every case, the final tolerances on your part will depend on a number of factors, including but not limited to:

  • Part size
  • Design geometry
  • The number, type, and size of features
  • Material(s)
  • Surface finish
  • Manufacturing process

We will review your design and provide a design for manufacturing review, pointing out any areas where we may not be able to achieve your desired tolerances. It`s helpful to us if you can specify which areas in your design have critical tolerances that must be met and which can be slightly modified if needed to reduce time and costs involved.


Q2: How do you ensure your Automotive interior plastic mould quality?  

In order to deliver high-quality parts every time, we`ve instituted the following steps to ensure you get parts that meet and exceed your expectations.


  • A full design for manufacturing (DFM) review upon initial inquiry. This will be performed by our skilled engineering team, who will alert you to any issues before work begins.
  • All incoming material (metal and plastic) is 100% inspected using our in-house metrology equipment.
  • In-process and first article inspection.
  • Comprehensive final inspection with a full report.


Q3: Is the lead time in working days or calendar days?     

Lead times are quoted in working days. As per our terms and conditions, quoted lead times commence only after completion and confirmation of design for manufacturing review and the beginning of actual production.


Q4: How long does a quotation take?    

In most cases, we respond within a couple of days of receiving an RFQ. However, there may be situations when we must source material from an external supply and therefore the quotation may be delayed accordingly.


Q5: What is the difference between a multi-cavity mold and a family mold?    


A multi-cavity mold has multiple cavities of the same part; a family mold produces a set. For instance, for an electronic enclosure, you may need a front, back, battery door, and a button. Those could all be molded at once in a family mold.


Q6: How long does it take to build an Automotive air conditioner injection mold?


Depending on complexity and our tool room load, it can range from 2 to 12 weeks.


Q7: Can I modify the mold after the first run?    


We can modify our steel molds by additional machining, fill-in welding, welding in additional material, or inserting a replacement feature, for a reasonable cost. If the changes are too great, however, producing a new mold may be more cost-effective than reworking the existing one.



Automotive Interior Plastic Injection Mould

Automotive Interior Plastic Injection Mould,Automotive Interior Trim Parts,Plastic Car Dashboard,Plastic Car Air Conditioner

Zhejiang Ceeto Molding Technology Co.,Ltd. , https://www.ceetomold.com